Schultes, M.
How sensitive is your treating plant to operating conditions?
A normal expectation in the course of operating an amine treating plant for acid gas removal is that small changes in operating conditions will result in correspondingly small responses in plant performance. However, such expectations are not always well founded. To establish credibility for the process simulator used in the design of a new LNG plant, the mass-transfer rate-based simulation results for the new plant are compared with performance data from an operating LNG plant.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- U.S. summer driving season hits as gasoline supplies squeezed tight 6/12
- U.S. sanctions Cuban state oil company, adding obstacles for fuel imports 6/12
- Technip Energies secures major contract for Coral Norte floating LNG project in Mozambique 6/11
- Honeywell introduces Experion Cognition to deliver autonomous control room operations for Borouge International 6/11
- ABB expands non-invasive sensing portfolio to advance simpler and safer temperature measurement 6/11
- Bayer hopes to speed up biofuel feedstock plan amid Iran war energy crunch 6/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

