Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Emerson's Aspen Technology business releases new software with expanded AI capabilities, enhanced visualization and simplified workflows 5/13
- LanzaJet and BioD announce feasibility study for SAF plant in Colombia 5/13
- U.S. House targets big climate, clean energy rollbacks in budget proposal 5/13
- Chevron attempting to restart El Segundo, California refinery after taking units offline last week 5/13
- Mexico's Pemex plans to export less crude oil as new refinery starts up 5/13
- BASF is expanding its portfolio of raw materials for the production of concrete superplasticizers for the construction industry in the European market 5/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction