Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SAFFiRE Renewables breaks ground on SAF pilot plant in Kansas (U.S.) 9/20
- ABP awards CONSER tech licensing contract for 50,000-tpy maleic anhydride plant in Oman 9/20
- Technip Energies and KBR selected for a major LNG project by Lake Charles LNG 9/20
- UPM Biochemicals and Södra accelerate the commercialization of innovative lignin-based solutions 9/20
- LanzaTech signs MLA with SEKISUI to develop multiple commercial-scale waste-to-ethanol plants across Japan 9/20
- Twelve announces $645 MM in funding to transform CO2 into jet fuel and electrochemicals at scale 9/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction