Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- AVTL to develop ammonia terminal in Pipavav, India 6/20
- Chevron seeks buyers for 50% stake in Singapore refinery 6/20
- Asian refiners seek more Mideast oil after spot premiums jump on Israel-Iran conflict 6/20
- Mexican authorities discover clandestine mini-refinery in crackdown of illegal hydrocarbon trade 6/20
- Italy's Eni eyes new unit to manage oil refineries 6/20
- Inatech's Techoil implemented by Flint Hills Resources for a modern, integrated future 6/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction