Mulrooney, M.
Mike Mulrooney is the project and design services manager at ShureLine Construction. In addition, he serves as the quality control manger of piping fabrications. Prior to joining ShureLine in 2000, Mr. Mulrooney was an engineering designer for DuPont, assigned to plant capital projects. With more than 28 years of experience, he specializes in the design of piping systems for various industrial applications and chemical processes. He holds a BS degree in engineering from Widener University.
Modularization: The key to success in today’s market
Process Control
/ Project Management
/ Refining
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Management
The world economic order is rapidly changing. A transition is underway, led by the sudden collapse of crude oil and natural gas prices. Here, the pros and cons of modularization vs. field construction are outlined.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- S-Oil's $7-B Shaheen petrochemical complex is on track for 1H 2026 start 2/17
- SBM Offshore awarded a study by Petrobras for FPSO CO2 carbon capture solution 2/17
- Drone strike hits Chevron, Exxon oil exports via Russia 2/17
- Marine fuel sales at top bunker hub Singapore log soft start to 2025 2/17
- Toyo-Malaysia secures OSBL project to support SAF production facility at Pengerang, Johor, Malaysia 2/14
- TOYO awarded licensing and equipment supply contract for the first ever urea fertilizer plant in Angola 2/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction