Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Orlen halts Olefins III project due to ballooning costs 12/11
- bp extends global agreement with ABB as automation, electrical and telecommunications strategic supplier for upstream/downstream facilities 12/11
- Phillips 66 teams with NextEra Energy Resources to power Rodeo Renewable Energy Complex with solar facility 12/10
- Global airlines could miss sustainable fuel targets, says IATA 12/10
- INEOS-led Greensand to become first full-scale CO2 storage facility in EU 12/10
- Air Liquide receives EU grant to develop large-scale H2-from-ammonia ENHANCE project 12/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction