Harrison, P.
Peter Harrison graduated from Loughborough University in the UK in 2009 with an MS degree in chemical engineering. He has worked in APC since 2011, and is now leading the deployment and continual improvement of APC applications at Total’s Lindsey refinery in the UK.
Advanced process control of debutanizers makes use of inferential predictions
Following good experience with a generalized cut-point calculation (GCC) inferential package, which models main fractionators with side streams, French energy major Total decided to experiment with a generalized distillation shortcut (GDS) inferential package, which models simpler, two-product distillation columns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe fuels China’s push for sustainable aviation fuel: Selected as technology provider for major project 1/23
- Europe set for record LNG imports in 2026 1/23
- Plug Power completes installation of 100-MW GenEco electrolyzer units at Galp’s Sines refinery 1/23
- Reju announces site selection for first U.S. industrial-sized facility regeneration hub 1/23
- Engineering a low-cost alternative catalyst for producing sustainable petrochemicals 1/23
- New report identifies methanol-to-jet as a key accelerator of the next wave of sustainable aviation fuel 1/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

