September 2023
Maintenance and Reliability
The preventive maintenance “Job Plan 2.0”
The purpose of a preventive maintenance (PM) plan is to sustain the functionality or condition of an asset based on pre-established job plans with tasks to be executed at regular operating hours, elapsed time periods or work cycles.
The Author
Related Articles
- Differential thermal expansion and welding problems in dissimilar joint of carbon steel to austenitic stainless-steel piping in high-temperature applications
- To improve maintenance, check out the view from the edge
- Editorial Comment: Celebrating the technologies and people in the global hydrocarbon processing industry
Comments