Ajayi, V., Ernst & Young;
Carroll, M., Georgia Pacific;
Chevis, M., Guffman Ventures;
Gil-Ortega, A. V., Fortinet;
Habibi, E., PAS Global;
Klotz, T., Covanta;
Laas, J.,
Wilcox, S., PNM Resources
Digitalization and Industry 4.0 initiatives require tight integration between complex, heterogeneous and highly complex industrial control systems (ICS) and enterprise information technology (IT).
The following is a mixture of technical articles, columns and headlines published in the 1920s by The Refiner and Natural Gasoline Manufacturer, the forerunner to Hydrocarbon Processing.
As a rule, equipment to be installed at a plant site initially arrives at an outdoor storage yard.
In the wake of an extraordinary year marred by the impact of the COVID-19 pandemic, the author’s company released the results of its 2021 Operational Risk Management Survey1 of executives, a barometer of the topics that dominate boardroom discussions around the world.
More than 100 fluid bed reactors for chemical synthesis and comparable processes using Group A powders have been installed and operated successfully since the late 1940s, with some reactors having an inside diameter at much larger than 7 m (23 ft).
The state of understanding science and facts on one side and distinguishing these from anecdotes and far-fetched opinions on the other side, should be concerning to us.
Hydrocarbon Processing, the downstream processing sector’s leading technical publication for nearly 100 yr, has announced the winners for its fifth annual HP Awards, which celebrate innovative technologies and people that have been instrumental in improving facility operations over the past year.
In Part 1, the broad concept of materials management was discussed, along with materials management as an investment and attitude.
Hydrocarbon Processing, the downstream processing sector’s leading technical publication for nearly 100 yr, has announced the finalists for its fifth annual HP Awards, which celebrate innovative technologies and people that have been instrumental in improving facility operations over the past year.
As a veteran of many capital projects once observed, “All projects execute materials management—those that do so without a plan and the appropriate resources just do it very poorly.”