Sheilan, M.
Mike Sheilan is the Co-founder of Amine Experts and is the Senior Principal Engineer for Amine Experts and Dehydration Experts. For 41 yr, he has provided training and consulting services in hydrate control, gas dehydration, gas and liquid sweetening, hydrocarbon recovery and sulfur plant operations.He is a co-author of the industry reference textbook Amine Treating and Sour Water Stripping.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- China Shipbuilding’s and Lemissoler’s first methanol-fueled Ultramax bulk carrier receives ABS approval 12/8
- RTX's Pratt & Whitney Canada and Leonardo achieve first 100% SAF flight with AW139 helicopter 12/8
- Maersk to deploy first large methanol-enabled vessel on Asia - Europe trade lane 12/8
- Shell sees $6 B in oil and gas investments in Nigeria 12/8
- Mexico's Pemex eyeing later refinery start-up date, months after initial announcement 12/8
- Indonesia's Pertamina starts carbon injection tests in Sukowati oil and gas field 12/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction