Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- PyroGenesis announces completion of coke-oven gas valorization and H2 production project for Tata Steel 7/15
- New protein-based system enables plastic recycling with reusable enzymes 7/15
- CF Industries starts Donaldsonville (U.S.) Complex CO2 dehydration and compression unit, permanent CO2 sequestration 7/15
- Emerson introduces GenAI-enabled automation for power and water industries 7/15
- Trump's sanctions threat looms over Russian oil exports to China, India and Turkey 7/15
- China state refiners ramp up output on rising demand, stock rebuild 7/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction