Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- bp’s Cherry Point refinery turns feedstock into renewable diesel fuel. Here’s how. 5/7
- Heavy oil shortages are driving up refiners' cost 5/7
- U.S. West Coast refinery demand for hydrogen increasingly met by merchant suppliers 5/7
- BASF invests in capacity expansion of Basoflux® range of paraffin inhibitors in Spain 5/7
- Shell in talks to sell Malaysia fuel stations to Saudi Aramco 5/7
- India's fuel demand increases more than 6% y-o-y 5/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction