Köster, R.
Rainer Köster is Manager of Asset Development at BAYERNOIL, and has been working for the company and BP since 1988. He holds a degree in chemical engineering from the University of Hannover.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sherwin-Williams unveils new advanced energy barrier that eliminates threat of corrosion under insulation 6/26
- SIBUR develops new polyethylene grade for beverage packaging 6/26
- IGS launches Rovex, a next-generation robotic cleaning technology for fired heater efficiency 6/26
- A comprehensive technical evaluation of polypropylene technology platforms 6/26
- Sasol and Topsoe to refocus SAF partnership as Zaffra JV prepares for wind-down 6/26
- Indonesia sets 3-month transition period for B50 biodiesel program 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

