Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Nextchem (Maire) awarded licensing/process design package for H2 unit in Vietnam 10/10
- TotalEnergies expands global LNG bunkering footprint 10/10
- BASF expands its sustainable polyamide portfolio with products with reduced and net-zero CO2 footprints 10/10
- Oil group MOL's refineries shift to non-Russian crude faces delay 10/10
- The Gulf Energy Information Excellence Awards 2024 winners honored at live Houston gala 10/9
- QatarEnergy signs 20-yr naphtha supply deal with Shell 10/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction