Izadi, M.
At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Orlen halts Olefins III project due to ballooning costs 12/11
- Chevron upgrades Pasadena refinery to increase capacity, feedstock and product flexibility 12/11
- BASF and INOCAS sign agreement to develop sustainable Macaúba oil supply in Brazil to produce bio-naphtha 12/11
- bp extends GFA with ABB as supplier of automation across upstream/downstream assets 12/11
- BASF starts up its expanded ammonium chloride plant in Ludwigshafen 12/11
- Phillips 66 teams with NextEra Energy Resources to power Rodeo Renewable Energy Complex with solar facility 12/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction