Smith, C. L.
Enhance process control performance
Properly incorporating summers into a control configuration can increase benefits for nominal cost
Consider process control a specialty within chemical engineering – Part 3
By recognizing which process conditions are limiting, designs can avoid pitfalls in control strategies
Consider process control a specialty within chemical engineering – Part 1
Incorporating more process reactions in the unit's P&I, engineers will be able to design better control systems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sherwin-Williams unveils new advanced energy barrier that eliminates threat of corrosion under insulation 6/26
- SIBUR develops new polyethylene grade for beverage packaging 6/26
- IGS launches Rovex, a next-generation robotic cleaning technology for fired heater efficiency 6/26
- A comprehensive technical evaluation of polypropylene technology platforms 6/26
- Sasol and Topsoe to refocus SAF partnership as Zaffra JV prepares for wind-down 6/26
- Indonesia sets 3-month transition period for B50 biodiesel program 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

