Singh, J.
Jagdeep Singh is the Deputy General Manager of the cost engineering department for Engineers India Ltd. He has 20 yr of experience in costing estimates for refinery and petrochemical plants. He earned his degree in electronics and instrumentation engineering at TIET (Thapar Institute of Engineering and Technology) in Patiala, India.
Assess remaining life for heater tubes
Refineries and petrochemical plants form some of the major sections of the hydrocarbon industry and consume much of the fuel that is burned in furnaces (heaters and specialty furnaces, such as reformers and crackers) to meet process heating requirements.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Bio-based aromatics give pathway to drop-in 100% SAF 12/4
- Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection 12/4
- Suez Canal and Scatec sign $1.1-B green methanol MoU 12/4
- Kuwait's al-Zour refinery now fully operational 12/4
- Petroecuador says crude oil output surpasses 400,000 bpd 12/4
- Russia's seaborne diesel exports rose in November with the ban lifted and increased production 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction