Markham, N.
Nathan Markham graduated from the University of Kansas with a BS degree in chemical engineering in May 2009. He works as a Process Safety Engineer for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kandla Port (India) advances methanol bunkering, marks key step toward green maritime transition 4/13
- PureField Ingredients receives U.S. EPA approval for ethanol carbon capture initiative 4/13
- Eslinger Biofuels and STX Group announce landmark clean fuel partnership 4/13
- FincoEnergies and Scan Global Logistics partner on Biofuel Swap verifiable road transport CO₂e reductions 4/13
- Indian state government approves $1.2-B, first-of-its-kind bamboo-to-biomethanol facility 4/13
- NextDecade to use Honeywell liquefaction technology for 30-MMtpy LNG terminal 4/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

