Mosir, M.
Marina Mosir has more than 15 yr of work experiences in the refining and natural gas/LNG industry as a Process Engineer, Lead Process Engineer and Engineering Manager for various Petronas operating units and capital projects. She is a mass transfer design expert within Petronas, with more than 12 yr of experience in revamping, troubleshooting and designing distillation columns and separators.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- U.S. diesel exports to ARA set to rise on scarce European supply, firm US production 12/6
- Russian petrochemicals giant Sibur plans IPO in coming months 12/6
- Phillips 66 and United Airlines sign SAF supply agreement 12/6
- Varo Energy in talks to buy Preem's Swedish refineries 12/6
- Biden administration will not finalize clean fuel tax credit guidance 12/6
- Petroleum Economist’s Paul Hickin recognized among the 50 voices in commodities worth following 12/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction