Jadav, N.
Nikul Jadav is a Consultant Piping Engineer for the Tanajib Gas Plant Projects, part of Saudi Aramco’s Marjan Development Program. He has worked over the last 20 yr across diverse projects and clients within the oil and gas sector, with a key focus on plant layout, piping design and engineering. Mr. Jadav holds an MS degree in project management from The University of Liverpool, U.K.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Singapore's largest data center to use Neste renewable diesel to power generators 9/12
- BASF inaugurates new plant for alkyl ethanolamines at its Antwerp Verbund site 9/12
- Ceres Power Holdings signs SOEC systems license with Thermax to decarbonize hard-to-abate industries 9/12
- Ineos to cease refinery operations at Grangemouth 9/12
- Leading olive oil producer Spain turns to olive stones for fuel 9/12
- bp, Iberdrola take FID on Spain's largest green hydrogen plant 9/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction