Orman, S.
SULTAN ORMAN is a Process Superintendent at Tüpraş headquarters, responsible for hydrogen production units. She has experience in building a management information system to monitor the performances of refining process units. She holds MS and BS degrees in chemical engineering from Middle East Technical University and an MBA degree from Koç University in Istanbul, Turkey.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Shell, CNOOC take FID on 1.6-MMtpy petrochemical complex expansion in China 1/15
- Russian oil products trapped at sea by U.S. sanctions 1/15
- California (U.S.) withdraws clean truck EPA waiver request ahead of Trump inauguration 1/15
- Amazon orders 200 new electric heavy trucks from Daimler for Germany, UK 1/15
- Colonial Pipeline shuts main gasoline artery after potential gasoline spill 1/15
- U.S. issues partial guidance on clean fuel subsidies, chafing ethanol makers 1/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction