Bartell, P.
Patrick Bartell is the Vice President of Sales for Valin Corp., a technical solutions provider for the technology, energy, life sciences, natural resources and transportation industries. Valin offers personalized order management, onsite field support, comprehensive training and applied expert engineering.
Heat Transfer: Designing electric process heater systems for catalytic regeneration
Achieving effective catalyst regeneration requires a process that produces a very high level of heat in a very efficient manner. Over the years, several different approaches have been taken to create this required heat. Traditional steam has been a popular choice, as has heated transfer media. However, these methods have limitations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- From corn fields to cargo ships, ethanol gains early traction as marine fuel 6/12
- Indonesia raises price of widely used fuel by 32%, adds to cost-of-living concerns 6/12
- Technip Energies, Safran, Airbus, Tereos to form green jet fuel venture in France 6/12
- Saipem awarded €900-MM gas compression plant project in Saudi Arabia 6/12
- Trans Mountain pipeline in Canada hits full capacity two years after upgrade 6/12
- MB Energy and Zaffra sign MoU to advance commercialization of eSAF in Europe 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

