Bartell, P.
Patrick Bartell is the Vice President of Sales for Valin Corp., a technical solutions provider for the technology, energy, life sciences, natural resources and transportation industries. Valin offers personalized order management, onsite field support, comprehensive training and applied expert engineering.
Heat Transfer: Designing electric process heater systems for catalytic regeneration
Achieving effective catalyst regeneration requires a process that produces a very high level of heat in a very efficient manner. Over the years, several different approaches have been taken to create this required heat. Traditional steam has been a popular choice, as has heated transfer media. However, these methods have limitations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Maire signs MoU to explore SAF production in Kazakhstan 6/24
- Air Liquide to supply gases to Silleno's world-scale polyethylene plant 6/24
- Moscow oil refinery hit by drone attacks is unlikely to resume production this year 6/24
- ExxonMobil's Antwerp refinery to stop output from June 29–July 3 due to strike 6/24
- Singapore's Aster plans August maintenance for crude, petchem units 6/24
- TotalEnergies must invest in Gulf pipelines to bypass Hormuz, CEO says 6/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

