Maleki, M.
Select optimal schemes for gas processing plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Engineering & Design
/ Gas to liquids (GTL)
/ Middle East
/ Natural Gas
/ Sulfur
/ Treating
With careful analysis, meet product requirements and environmental standards
Best practices in treating liquefied petroleum gas are defined
Gas Processing/LNG
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Middle East
Advantages of removing H2S before the LPG unit and energy optimization of the LPG splitter
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- QatarEnergy signs 20-yr naphtha supply deal with Shell 10/8
- Aspen Technology launches microgrid management system to address power reliability and meet net-zero goals 10/8
- Digital Feature: Refiner improves operational technology risk measurement and management: A Case Study on addressing the cyber risks in the oil and gas industry 10/8
- Ineos' Ratcliffe: 600 jobs at stake at Geel PTA plant due to overzealous regulations 10/8
- Poland's Orlen's petchem project's capex continues to rise 10/8
- bp abandons goal to cut oil output, resets strategy 10/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction