Zolfkhani, M.
Optimize LNG boil-off gas systems for regasification terminals
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gas to liquids (GTL)
/ Gasification
/ Middle East
/ Natural Gas
Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- DOMO Chemicals responds to surging demand in China with its new TECHNYL polyamide production plant 4/29
- Ineos shuts down Canadian unit for maintenance after chemical leak 4/29
- India's Chennai Petroleum sees two-year delay in building new 180,000-bpd refinery 4/29
- PetroChina profit boosted by stronger gas sales and fuel demand 4/29
- thyssenkrupp Uhde completes EnviNOx project for Dyno Nobel in Australia 4/29
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction