Corrosion
Failure analysis of an ethylene cracking heater finned tube
Here's what caused the leak and the steps taken to prevent future leaks
Optimum specification and quality requirements for pressure vessels
Most pressure vessels are custom designed because of the specific requirements of the process. Depending on the service conditions, some of these vessels will fall under the category of lethal service..
Major improvements in reactor effluent air cooler reliability
Joint industry program provides a new methodology for assessing and controlling ammonium bisulfide corrosion
Failure analysis of ethylene cracking heater convection section dilution steam tube
Several inspection techniques were required to determine the root cause of the failure
Estimating corrosion in metallic stacks caused by hydrochloric acid
Simple method can be used to calculate the dewpoint temperature
Effect of process deposits on the corrosion behavior of titanium in brine
The temperature and pH need to be controlled to avoid problems
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sherwin-Williams unveils new advanced energy barrier that eliminates threat of corrosion under insulation 6/26
- SIBUR develops new polyethylene grade for beverage packaging 6/26
- IGS launches Rovex, a next-generation robotic cleaning technology for fired heater efficiency 6/26
- A comprehensive technical evaluation of polypropylene technology platforms 6/26
- Sasol and Topsoe to refocus SAF partnership as Zaffra JV prepares for wind-down 6/26
- Indonesia sets 3-month transition period for B50 biodiesel program 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

