Singh, D.
Meeting diesel specifications at sustained production
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Gasification
/ Gasoline
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Octane
/ Reactors
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Redesign crude preheater train for efficiency
Over design of heat exchangers sourced to fouling problems
Improve natural gas liquids recovery
Designing for temperature variations does impact operating costs and unit efficiencies
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
- Repairs continuing on hydrocracker at Marathon Galveston Bay Texas Refinery (U.S) 7/16
- PyroGenesis announces completion of coke-oven gas valorization and H2 production project for Tata Steel 7/15
- New protein-based system enables plastic recycling with reusable enzymes 7/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction