Street, M.
New residue-upgrading complex achieves Euro 5 specifications
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Carbon Management
/ Catalysts
/ Compressors
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasification
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Loss Prevention
/ Management
/ Middle East
/ Naphtha
/ Octane
/ Reactors
/ Safety
In late 2010, Grupa LOTOS SA completed construction of a major residue-upgrading project at its refinery in Gdańsk, Poland. Its 10+ Program was designed to unlock a step change in the facility’s long-term profitability. After two years of operating, this project has had a profound effect on the refinery’s economics.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Yara begins production of renewable-based ammonia in Brazil 12/9
- Two dead, 9 injured, 4 missing in blast at Eni site near Florence 12/9
- Gentari to supply large-scale, carbon-free energy to AMG Ammonia's new green ammonia facility 12/9
- Aramco, TotalEnergies and SIRC assess the development of SAF unit 12/9
- Hycamite, MOLEA and MOL PLUS sign MoU to promote methane-splitting for power generation and marine vessel propulsion 12/9
- California law and refinery closure reflect ongoing challenges for state’s fuel market 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction