Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Petrochemicals

INEOS announces the acquisition of the LyondellBasell ethylene oxide & derivatives business and production facility at Bayport, Texas (U.S.) for $700 MM

INEOS has announced an agreement with LyondellBasell to buy its ethylene oxide & derivatives business including the Bayport Underwood site, Texas.

Two new petrochemical plants are coming online in India

Two multi-billion-dollar petrochemical plants are coming online in India in coming months at a time of weaker-than-expected demand, setting the stage for fierce price competition domestically and internationally.

Eight Texas (U.S.) chemical plant workers treated for toxic gas exposure

Eight people were taken to a hospital for treatment after a toxic gas leak at Altivia Chemicals' plant in La Porte, Texas.

Fluor announces Q3 contracts from Dow for net-zero ethylene cracker and derivatives complex in Canada

Fluor Corporation was awarded two contracts from Dow for the construction of the world’s first net-zero scope 1 and 2 emissions integrated ethylene cracker and derivatives complex in Fort Saskatchewan, Alberta, Canada.

Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection

Radiant tube failure ranks as a primary cause of unplanned shutdowns in ethylene cracking furnaces. This article examines tube failures via carburization, along with a proprietary technology that provides comprehensive multi-aspect inspection data to mitigate ethylene radiant tube failures.

Are resources and capacity the same?

Project Production Institute: Arbulu, R. J.

If you are involved in the delivery of capital projects, there is a good chance that you may have heard, or even used, expressions such as, “We have a resource-loaded schedule,” “We are behind schedule, so let’s add more resources,” or “We need to increase our capacity.”

A CFD study on the effect of operating an SMR furnace without one of the flue gas tunnels A

Blasch Precision Ceramics: Russell, W.

A computational fluid dynamics study was performed on a theoretical reforming furnace to determine the comparative results of flow uniformity in flue gas tunnels with and without a standing tunnel in the outer position.

How to gain an advantage from the propylene production gap—Part 2

Petrobras: Da Silva, M. W.

This work will detail the available processing routes capable of maximizing propylene yield in refineries, allowing refiners to gain advantage from the propylene market.

Innovations

Hydrocarbon Processing Staff: Rhodes, Mike

Endress+Hauser’s newly developed iTEMP TMT31 temperature transmitter for analog 4-20mA signals is characterized by its long-term stability, high accuracy and ease of use for reliable temperature measurement.

thyssenkrupp Uhde won contract for biopolymer plant from Gulf Biopolymers Industries Ltd

thyssenkrupp Uhde has secured a basic engineering package and front-end engineering design package for the establishment of a biopolymer plant on the Arabian Peninsula.