A. M. Al-Suwaidi
Abdulla Mohammed Al-Suwaidi is a Process Engineering Manager at ADNOC Refining. He has more than 20 yr of expertise, with a wide range of experience in plant operations, process engineering, troubleshooting and project management of refinery process plants, covering crude distillation to utilities. He earned a BS degree in chemical engineering from Washington State University.
RFCCU revamp to improve main fractionator gascon column performance and minimize propylene losses to refinery offgas
This article will discuss the critical parameters that could potentially affect the performance of a residue fluid catalytic cracking plant’s main fractionator and gas concentration (gascon) section columns. It will also elaborate on how the systematic troubleshooting methodology helped to solve the problems and improve column performance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

