Gentry, M. R.
Matthew R. Gentry has worked for Airflow Sciences Corp. for more than 15 yr, performing flow modeling as well as laboratory and field testing. He has served as project manager for heat recovery steam generators, waste heat recovery units, selective catalytic reduction and sorbent injection projects, helping optimize performance and pollution control in a wide variety of industrial applications. Mr. Gentry received his MSE degree in Aerospace Engineering from the University of Michigan in 2004, with a specialization in structural mechanics.
Flow modeling as a tool for WHRU performance optimization
Process Optimization
/ Refining
/ Petrochemicals
/ Gas Processing/LNG
/ Heat Transfer
/ Carbon Management
/ Environment & Safety
/ Information Systems
Greenhouse gas (GHG) emissions have become a growing concern for many industrialized countries over the past few years.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to invest £150 MM at Grangemouth site 12/17
- KBR’s methanol technology selected by Fikrat Al-Tadweer for the first biomethanol plant in Saudi Arabia 12/17
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

