Shah, K.
Minimize risks from cryogenic exposure on LNG facilities
A rational approach investigates methods to protect equipment and infrastructure from liquefied natural gas releases
Improve process control in gas plants using tunable diode laser spectroscopy
This analyzer technology is replacing conventional sensors to improve the bottom line
Improve gas interchangeability for LNG terminals
Quality issues on imported natural gas will require more processing at receiving sites
Simple techniques for generating process control inferentials
Property estimation can be done with easy statistical tools and spreadsheet software
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction