Das, T.
Thermal decomposition of particulate mercury sulfides in petroleum—Part 2
U.S.
/ Analyzers
/ Crude oil
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Instrumentation
/ Loss Prevention
/ Process Optimization
/ Reactors
/ Refining
Traces of particulate mercury sulfide (HgS) in stabilized crude oils transform to elemental mercury below 400°C in refinery distillation units. The authors evaluated this transformation and measured reaction rates and activation energies in crude oil and Hg-spiked mineral oil, using glass vessels at atmospheric pressure and a microunit at 1,000 psig.
Thermal decomposition of particulate mercury sulfides in petroleum—Part 1
Analyzers
/ Crude oil
/ Distillation
/ Engineering & Design
/ Environment & Safety
/ Environment
/ Equipment
/ Instrumentation
/ Loss Prevention
/ Process Optimization
/ Refining
/ Reactors
Traces of particulate mercury sulfide (HgS) in stabilized crude oils transform to elemental mercury below 400°C in refinery distillation units. The authors evaluated this transformation and measured reaction rates and activation energies in crude oil and Hg-spiked mineral oil, using glass vessels at atmospheric pressure and a microunit at 1,000 psig.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

