Lai, H.
Haiming Lai is a Principal Consultant with Integrated Oilsands and Bitumen Project of China National Offshore Oil Corp. (CNOOC) in Calgary, Canada. He has more than 20 yr of experience in modeling and simulation, process design and operation in the upgrading, refining and petrochemical industries. He holds a PhD in chemical engineering from Beijing University of Chemical Technology and is a registered professional engineer in Alberta, Canada.
Debottleneck H2 production for gasifier PSA-based plant
The Canadian oil sands reserves in the area surrounding Fort McMurray, Alberta in Canada contain in excess of 165 Bbbl of recoverable bitumen.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
- Nigeria's NNPC partners local firm on new 100,000 bpd refinery 4/25
- Stranded cargo shows credit challenges at Nigeria's Dangote refinery 4/25
- Low U.S. distillate consumption reflects slow economic activity and biofuel substitution 4/25
- Clariant catalysts reduce customers’ footprints by 40 million tons of CO2e in 2023 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction