Batra, K.
Kapil Batra works as Deputy Manager in the heat transfer department at Engineers India Ltd. in New Delhi. Mr. Batra has a progressive work experience of 8 yr in fired heaters and combustion systems. He is a chemical engineering graduate from the Laxminarayan Institute of Technology (LIT)-Nagpur.
Embrace tube metal temperature factor (FT) in fired heater design
Fired heaters are one of the most critical pieces of equipment in a refinery. They
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Holland America starts pilot tests using renewable fuels on cruise liner 5/3
- U.S. admin sets path for ethanol aviation fuel subsidies 5/3
- Ryazan refinery (Russia) hit by drone strike 5/3
- Novatek's new Ust-Luga condensate unit set for June testing 5/3
- Thiozen pilot successfully produces zero-emission H2 from sour gas waste streams 5/3
- Mexico's Pemex exported 20,000 bpd of crude, fuel to Cuba in H2 2023 5/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction