Jayanti, V. K.
V. Kamesh Jayanti is deputy manager at the R&D division of EIL. He joined EIL in 2006 after completing his MTech degree in chemical engineering from the Indian Institute of Technology (IIT) at Kharagpur. He has more than seven years of experience in design, adequacy checking for revamp projects, commissioning and troubleshooting in SRU, TGTU, ARU and O2 enrichment technology for capacity enhancement of the SRU.
Boost capacity of SRUs with mixing devices for oxygen enrichment
The requirement for additional sulfur recovery unit capacity in a refinery may stem from hydroprocessing operations; a refinery expansion project; a shift from lighter to heavier, sourer crudes to improve margins; or the need to remove extra sulfur content to meet tighter environmental regulations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to invest £150 MM at Grangemouth site 12/17
- KBR’s methanol technology selected by Fikrat Al-Tadweer for the first biomethanol plant in Saudi Arabia 12/17
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

