Deshmukh, A.
Adya Deshmukh is a Senior Process Engineer at Fluor. She has more than 20 yr of experience, specializing in CO2 processing, including Econamine FG PlusSM, direct air capture and CO2 compression/conditioning process design. She graduated from the University of Surrey in chemical engineering and is a registered chartered engineer.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 2: CO2 as an energy storage medium
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 1: CO2 as a refrigerant
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Compressors
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Heat Transfer
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

