Van Doorn, E.
Edwin van Doorn is a Fluor Corp. Fellow and Director of heat transfer at Fluor Amsterdam, with more than 20 yr of experience in industry. He serves on the Technical Committee HTRI and Expert Area Energy Efficiency Committee. Mr. van Doorn obtained his academic degree in engineering from the University of Eindhoven.
Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?
A reboiler provides the necessary heat duty for the separation in a distillation tower.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

