Mandal, K. K.
Improve hydrogen management of your refinery
A novel approach economically recovers plant gases
Is nitrogen really inert as a blanketing medium?
New investigation finds that this gas is soluble in hydrocracker feed
Optimize your gas concentration unit operations
Improve hydrogen sulfide removal techniques for quality control
Improve desalter control
Consider 'target-opening nonlinear control' for interface level
New level control techniques
Target flow nonlinear control and target opening nonlinear control offer advantages in some applications
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

