Fitzpatrick, P.
Paula Fitzpatrick, VP of Projects for the U.S., has covered many different engineering sectors, including subsea, offshore, midstream and energy transition, with more than 25 yr in the oil and gas industry. Fitzpatrick is as passionate about world-class project delivery to clients as she is about mentoring and developing the next generation of engineers.
Viewpoint: Empowering women in engineering
International Women in Engineering Day (INWED) is celebrated worldwide on June 23 every year to honor women in the engineering field. Hydrocarbon Processing (HP) sat down with Paula Fitzpatrick (PF), VP of Projects for the U.S., at Kent for an exclusive Q&A in celebration of INWED.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

