Advances in heat exchanger designs mitigate fouling problems with crude oil preheater trains while conserving energy and cutting operating costs
Cost savings of 'zero-fouling' crude oil preheaters
Unique configurations of proven self-cleaning fluidized bed heat exchangers virtually eliminate fouling in this application
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction