Remesat, D.
Consider CFD analysis to support critical separation operations
This modeling method can help eliminate chronic problems caused by feed mal-distribution and poorly designed feed devices
Consider the 'inside-out' approach to optimize distillation operations
Economic value can be obtained by involving heat exchanger and tower internal experts in the initial design development
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- GTT receives order from Samsung Heavy Industries for the tank design of two new very large ethane carriers 2/11
- Emerson introduces hybrid continuous gas analyzer for improved regulatory compliance and emissions control 2/11
- BASF to further strengthen Global Business Services through global hub setup 2/11
- Morocco signs agreement with ORNX consortium for $4.5-B green ammonia complex 2/11
- Rosneft oil refinery in Germany warns of risks from U.S. sanctions 2/11
- TotalEnergies takes over Zeeland refinery operations, Lukoil still owns 45% 2/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

