Schmidt, G.
is the Group Lead of Process Design for cracking furnaces at Linde Engineering in Munich. Since joining Linde Engineering in 1985, he has been involved in process and mechanical design, as well as in the operational concerns of cracking furnaces. After gathering experience in development, sales, field work and project management, Schmidt took over responsibility for furnace design in 2006. He studied chemical engineering at the University of Erlangen–Nuremberg, where he graduated with a Dipl.-Ing. (M.Sc.).
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
- India proposes rules to allow higher ethanol-blended fuels in vehicles 4/29
- Indian refiners' March crude processing slips 1.8% from a year earlier 4/29
- Sinopec refinery utilization drops, but chemical exports rise due to Iran war 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

