Frejborg, A.
Case history: Optimization of aromatics complex
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Alcohols
/ Americas
/ Analyzers
/ Aromatics
/ Asia/Pacific
/ Catalysts
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Reactors
/ Safety
/ Utilities
Borealis Polymers executed an online optimization project at its phenol and aromatics plants in Porvoo. The plantwide application increased the output rate by 9% and greatly improved the stability of operations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras signs on with Baker Hughes for sweeping gas turbines service agreement 3/18
- TwinThread launches Perfect Batch, an AI-powered analytics solution to optimize batch production 3/18
- bp to block union workers from Whiting refinery 3/18
- Analysis: Licocene Terra, using renewable carbon in hot melt polymers for adhesive formulations 3/18
- Ionautics finds breakthrough in iridium-based porous catalyst layer technology for green hydrogen production 3/18
- thyssenkrupp nucera supplies electrolyzers for Moeve’s green hydrogen project 3/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

