Jensen, D. R.
Daryl Jensen joined OGT as a Development Engineer in 2021. He spent the previous 15 yr with Ortloff Engineers (now, Honeywell UOP), during which his responsibilities included process design/development, simulation, basic engineering design pack-age project execution, process control design, and onsite startup/troubleshooting for gas processing and treating technologies, including sulfur recovery (refinery and gas plant), cryogenic NGL/LPG recovery, acid gas treating and sour water stripping. Jensen holds BS and MS degrees in electrical engineering from New Mexico State University and is a registered Professional Engineer in Texas.
Riding the dragon: Sulfur plant thermal reactor temperature measurement
Of all the fundamental measured process variables, temperature is perhaps the most reliable.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Evonik expands distribution partnership with IMCD for VISIOMER® Specialty Methacrylates in the U.S. 3/13
- RWE to invest €17 B in the U.S. to power data centers 3/13
- Petrobras' refineries operating at 97% of capacity 3/13
- ABB open to pursuing more than one multi-billion-dollar acquisition this year 3/13
- USW rejects bp's final offer to Whiting refinery (U.S.) workers 3/13
- Equinor has no spare oil and gas capacity, CEO says 3/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

