Trifilieff, O.
Olivier Trifilieff is the Market Sales and Business Development Manager for Pall Corp.’s FTAP group for the Europe, Middle East and Africa regions. He joined Pall Corp. in 2000 and has served in various marketing, sales and technical assistance roles for the oil and gas, refining and chemical industries.
Optimize LNG production through contaminant mitigation—Part 2
The production of liquefied natural gas (LNG) requires a number of stages to effectively purify the feed gas. These stages are essential to maintain continuous operation and to meet product specifications. Liquid and solid contamination issues are common in many feed gas purification operations and can cause severe problems with equipment fouling, leading to additional expenses in maintenance and equipment repair, reduced production capacity and even unscheduled shutdowns.
Optimize LNG production through contaminant mitigation—Part 1
The production of liquefied natural gas (LNG) requires a number of stages to effectively purify the feed gas. These stages are essential to maintain continuous operation and to meet product specifications.
- 1
- ... 1 pages
- Holland America starts pilot tests using renewable fuels on cruise liner 5/3
- U.S. admin sets path for ethanol aviation fuel subsidies 5/3
- Ryazan refinery (Russia) hit by drone strike 5/3
- Novatek's new Ust-Luga condensate unit set for June testing 5/3
- Thiozen pilot successfully produces zero-emission H2 from sour gas waste streams 5/3
- Mexico's Pemex exported 20,000 bpd of crude, fuel to Cuba in H2 2023 5/3