Rahimi Mofrad, S.
Rethink your overpressure systems
Consider multiple relief valve designs
What you should know about liquid thermal expansion
Decision flowchart aids in correct thermal relief valve requirements
Tower pressure relief calculation
A practical, less-complicated method for different emergency cases
Relief rate calculation for control valve failure
Use these equations to determine capacity requirements
Designing for pressure releases during fires—Part 2
Wetted equipment requires a different calculation approach for fire relief loads
Designing for pressure releases during fires - Part 1
How to determine if equipment should be considered wetted or unwetted when calculating fire relief load
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

