Zolfkhani, M.
Optimize LNG boil-off gas systems for regasification terminals
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gas to liquids (GTL)
/ Gasification
/ Middle East
/ Natural Gas
Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF starts up the world’s first production plant for 3D-printed catalysts in Ludwigshafen 3/19
- Haffner Energy receives rapid bookings for CORE100 clean-fuel production units 3/19
- ABB launches EmissionVision to automate advanced gas leak detection 3/19
- Ebara Elliott Energy partners with NuScale Power for use of advanced nuclear technology to power petrochemical plants 3/19
- bp agrees to sell 12-MMtpy Gelsenkirchen refinery to Klesch Group 3/19
- Sumitomo Corporation, “K” LINE and NYK Line conclude MoU for new build ammonia bunkering vessel operation in Singapore 3/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

