Gorji, A. H.
Finetune boil-off gas generation from refrigerated storage facilities
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Loss Prevention
/ Natural Gas
/ Piping
Improved estimation methods accurately calculate vaporized product for LNG and LPG storage and transfer systems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

