Kim, E.
Eunho Kim is a Junior Engineer on the Stationary Equipment Engineering team at SK energy. He is in charge of the FCCU, and has 5 yr of experience in detailed design and maintenance of equipment. He earned a BS degree in mechanical engineering from Inha University in South Korea.
Case study: Extend tube life in a waste heat boiler
Maintenance & Reliability
/ Refining
/ Boilers
/ Economics
/ Heat Transfer
/ Safety
/ Sulfur
/ Asia/Pacific
The sulfur recovery unit (SRU) separates sulfur from sulfur compounds.
Three topics for operational excellence related to a Cr-Mo hydrotreating reactor
Many end users are trying to use feedstock with higher sulfur content for their refineries to increase profitability, but numerous unknown or plausible bottlenecks exist.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Neste commissions largest upgrading facility for liquefied waste plastic, scales up chemical recycling 3/16
- South Korea to lift coal cap, boost nuclear output amid Iran crisis 3/16
- Vietnam braces for flight cuts from April after China, Thailand ban jet fuel exports 3/16
- Evonik expands distribution partnership with IMCD for VISIOMER® Specialty Methacrylates in the U.S. 3/13
- RWE to invest €17 B in the U.S. to power data centers 3/13
- Petrobras' refineries operating at 97% of capacity 3/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

