Seok, W.
is a maintenance and detailed design engineer at SK Energy in Ulsan, South Korea. He has over nine years of experience in static equipment maintenance and engineering, especially within RFCC plants. He has a BS degree in mechanical engineering from the University of Ulsan in South Korea.
Case study: Causes and countermeasures of a wall tube leak accident by an SNCR solution of a CO boiler in an RFCC process
Residue fluid catalytic cracking (RFCC) is a process that cracks heavy oil into light oil, such as gasoline, with zeolite catalysts.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vertex Energy pauses renewable diesel output to switch back to fossil fuels, citing macroeconomic woes 5/10
- Citgo Petroleum reports Q1 profit of $410 MM 5/10
- Golden Pass LNG in discussions with contractor, may delay startup 5/10
- Shipping major and GCMD to pilot FAME-VLSFO marine biofuel bunker fuel in Singapore 5/9
- Diesel profit margins decline amid lower demand, more capacity 5/9
- World Energy and Boston Consulting Group sign agreement on SAF certificates 5/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction